Recompose-it | Recycle your Silvadec boards and give them a second life.
No more trips to the skip: your Silvadec off-cuts and old installations now get a second life. Thanks to Recompose-it, your composite boards — whether construction off-cuts or an end-of-life deck, fence or cladding — are collected and transported at our expense, then recycled at our factory in Arzal to become new boards made in France. We take care of everything: provision of the appropriate container, organisation and full coverage of transport costs.
No more landfill or skip runs: your old Silvadec installation or construction off-cuts get a second life. Thanks to Recompose-it, they are collected, transported at our expense, then transformed into new boards made in France at our factory in Arzal — a true closed loop.
Our goals: Silvadec is committed to an ambitious approach to extending the lifespan of its composite material and reducing the environmental footprint of its products: the recycling of our composite boards, with the goal of tripling its processing capacity by 2030.
Which composite can you return to us?
Whether you are finishing a project or replacing Silvadec composite boards, we take back your boards and cover the transport costs. Two situations, two tailored solutions.
Solution 1: Do you have construction off-cuts?
After completing a Silvadec installation, there are often leftover cut pieces. Send them back to us — we take care of recycling them.
Silvadec composite only
Multiple products accepted
No foreign materials (metal, wood, screws…)
Return value: €0/T
Transport covered by Silvadec
Solution 2: Are you replacing an end-of-life installation?
Your old Silvadec composite boards deserve better than landfill. Return them sorted by product and benefit from a paid-back collection.
Sorted by product
With proof of purchase for a new Silvadec project: €500/T
Without proof of purchase: €100/T
Transport covered by Silvadec
Choosing your return packaging
Depending on the nature and volume of your materials, Recompose-it provides several packaging solutions suited to each return situation: Construction off-cuts, End-of-life installation.
Ecobox
Construction off-cuts
120 × 80 × 90 cm (open)
Empty weight: 50 kg
Capacity: +300 kg
Deposit: €150 excl. VAT
Ecobox Large
End-of-life installation
2.2 m × 0.75 m × 0.75 m
Capacity: ~1.1 T / 40 m²
Min.: 10 m² / 200 kg
Deposit: €150 excl. VAT
Pallet / Timber
End-of-life installation
Boards on pallet or timber
Strapping / wrapping required
Stable assembly for handling
Collection request
End-of-project off-cuts or an installation to replace: fill in the form corresponding to your situation. Collection is exclusively for Silvadec composite boards — transport is fully covered by us.
Construction off-cuts
Do you have leftover cut pieces after completing an installation? Submit your request online — we will organise the collection.
The Ecobox is reserved for a minimum return of 300 kg of Silvadec composite.
Are you replacing an existing Silvadec composite deck, fence or cladding? Submit your request online — we will assess your situation and organise the collection.