Info library

Image
Your fence and door project
Configure your project and get an immediate estimate of the cost
Cladding accessories
Image
Advice for preparing the ground
Ensuring water drainage: On all non-draining ground, you must ensure a slope of at least 10 mm per linear metre, parallel with the joists’ length, for water to run off, while also making sure water does not collect at the lowest point of the decking.
Societal
Our partnerships and our local integration are adding richness to our operation, and growing the Silvadec family.
Image
Instructions for installing decking accessories (ref. PU26)
Before beginning to install Silvadec removable clips, please refer to the installation instructions, document ref. PU26. View the pdf
Image
Instructions for installing removable clips (ref. PU32)
Before beginning to install Silvadec removable clips, please refer to the installation instructions, document ref. PU32. View the pdf #video
Image
Installing joists
The joists, of whatever type, must be installed using specific spacing, not exceeding the maximums detailed below:
Image
Fastening deck boards on removable clips
How to secure your deck boards using our removable clips
Image
Fastening boards on permanent clips
How to install and secure your deck boards The upper surface of deck boards and exposed accessories has a brushed finish, to imitate the appearance of wood and increase grip. The non-brushed surface must not be uppermost.
Image
Removing a board installed with removable clips
Do you need to remove a board that has been fixed in with our removable clip? The clip is designed so that the screw is accessible with a standard Torx T15 bit. Slightly loosen the clip and shift it to position the screw head above the “lock hole”.